Tel: (647) 478-9292 | Contact Us

Restaurant Permit Drawings

screen icon

Restaurant Permit Drawings in Toronto & the GTA

Restaurant projects are reviewed differently from a basic office or retail renovation because the use can affect food premises planning, kitchen equipment, exhaust, make-up air, plumbing, washrooms, seating, accessibility, life safety and sometimes zoning or licensing.

Acadia Drafting prepares permit-ready restaurant drawings for tenants, landlords, contractors and business owners. We help turn the proposed business plan into clear architectural drawings and coordinate the code information the city needs to review the project.

Restaurant, cafe, takeout, bakery and food-service permit drawing packages.

Kitchen equipment layout, handwash sinks, dishwashing, food storage and waste areas.

Commercial kitchen exhaust, make-up air, plumbing and washroom coordination when required.

City comment response support for incomplete or rejected restaurant permit applications.

Restaurant Projects We Can Help With:

  • New restaurant or quick-service restaurant in an existing commercial unit.
  • Takeout restaurant, cafe, bakery, bubble tea shop, dessert shop or sandwich shop.
  • Kitchen renovation with new hood, exhaust, make-up air or cooking equipment.
  • Dining room changes that affect seating, exits, travel distance or washroom access.
  • Retail or office unit converting to food-service use.
  • Existing food business responding to Toronto Building or Toronto Public Health comments.

Restaurant permit drawings with commercial kitchen equipment and exhaust coordination

drawing icon

What Your Restaurant Drawing Package Includes

A strong restaurant permit set must do more than show a nice layout. It should explain how the space functions for staff, customers, food handling, plumbing, ventilation, exits and municipal review.

Depending on the project, Acadia can prepare or coordinate:

  • Existing and proposed floor plans with room names, dimensions, seating and service areas.
  • Kitchen equipment layout with cooking line, prep areas, storage, handwash basins, sinks and dishwashing locations.
  • Washroom layout, barrier-free path of travel and accessibility coordination where applicable.
  • Reflected ceiling plan, hood/exhaust coordination, make-up air coordination and HVAC notes where required.
  • OBC/code notes for occupancy, occupant load, exits, fire separations and life safety.
  • Plumbing fixture layout and consultant coordination for drains, fixtures, grease-related items and water service scope when required.
  • Landlord/base building coordination notes and city comment revisions.

Commercial restaurant permit drawing package with kitchen and code review sheets

Restaurant Review Items to Plan Early

Restaurant delays often happen when the drawings do not clearly show how food-service, ventilation, plumbing and customer areas work together. These are the items we recommend confirming before construction pricing or permit submission.

Review Item Why It Matters What to Show in the Drawings
Food premises layout Toronto Public Health asks for plan information showing equipment, sinks, food storage, waste storage and staff facilities. Equipment plan, prep/storage areas, utensil washing, handwash basins, staff washrooms/change areas and waste storage.
Cooking exhaust and make-up air Commercial kitchen exhaust can trigger mechanical coordination and dedicated ventilation review. Hood location, cooking equipment, duct route assumptions, make-up air strategy and mechanical consultant coordination.
Seating and occupant load Dining areas can affect exits, washrooms, life safety and barrier-free access. Seating count, clear aisles, exit access paths, travel distances and washroom path of travel.
Change of use or zoning A retail or office unit becoming a restaurant may need zoning/use review or change-of-use permit information. Existing/proposed use notes, zoning-use check, occupancy/code summary and affected building systems.
Plumbing and washrooms New fixtures, floor drains, sinks or washroom changes can trigger plumbing permit information. Fixture locations, washroom dimensions, accessible clearances, drain/service coordination and fixture schedule notes.

Toronto permit fee/source notes: For Toronto, 2026 non-residential interior alteration fees are listed as $12.45/m2 for Group A, B and D and $11.53/m2 for Group C, E and F. Toronto also lists commercial kitchen exhaust/special ventilation systems at $463.95 flat, HVAC alterations at $214.79 flat, and all-other-building plumbing fixtures/equipment/roof drains at $30.94 each. Final fees depend on the exact scope and occupancy classification.

Last reviewed: August 3, 2026

Official sources: City of Toronto – Interior Alterations (Non-Residential) | Toronto Public Health – Submitting Plans for Food Premises | City of Toronto – Eating or Drinking Establishment | City of Toronto – Standalone Mechanical (HVAC) | City of Toronto – Building Permit Fees

Official Restaurant Permit Sources

We add source links near restaurant permit claims so visitors, contractors and reviewers can verify the fee and submission requirements without hunting for them.

Source What It Means for This Page
Toronto Public Health plan submission guidance Food premises plans should show kitchen equipment, utensil washing, handwash basins, food storage, waste storage and staff washrooms/change rooms.
Toronto eating or drinking establishment guidance Restaurants and similar businesses may need zoning/licensing review in addition to building permit drawings.
Toronto non-residential interior alteration guide Permit drawings should be scaled, dimensioned, signed/dated and show existing/proposed uses, plumbing fixtures, ceiling details and life-safety information.
Toronto standalone mechanical/HVAC guide Mechanical submissions can require equipment type/location/size, heat loss/gain, duct design and ventilation calculations.

Our Commercial Permit Process

01

Review the unit

We review the address, lease/unit information, existing drawings, proposed use and landlord requirements.

02

Confirm permit triggers

We flag layout, occupancy, accessibility, washroom, HVAC, plumbing, structural and fire/life-safety items that may affect review.

03

Prepare drawings

We build a permit-ready drawing set with the plans, notes, dimensions, schedules and consultant coordination required for the scope.

04

Support review

If the municipality issues comments, we help revise drawings and coordinate missing information so the application can keep moving.

Related Commercial Permit Services

Restaurant work often overlaps with other commercial permit services. These links help visitors reach the most specific page for their project.

Frequently Asked Questions

These are the practical questions restaurant owners and contractors usually ask before starting restaurant permit drawings.

Usually, yes. Restaurant renovations commonly affect layout, washrooms, plumbing, ventilation, exits, accessibility, fire/life-safety and sometimes the approved use of the unit, so building permit drawings are often required before construction starts.

Yes. A restaurant package should show cooking equipment, prep areas, handwash basins, utensil washing, dishwashing, food storage, waste storage and staff facilities so building, health and trade requirements can be reviewed together.

Often, yes. Commercial kitchen exhaust, make-up air, duct routing, ventilation rates and equipment details can require mechanical design or consultant coordination. The exact requirement depends on the cooking equipment and base building conditions.

Yes. A retail-to-restaurant project may need change-of-use review, zoning/use review, plumbing, washroom, kitchen exhaust and life-safety coordination. Acadia can prepare the permit drawings and coordinate the required code notes.

Send the project address, lease or unit information, existing drawings if available, proposed menu/concept, equipment list, seating plan, landlord requirements and any city or health department comments already received.

Toronto fees can include interior alteration area, HVAC or special ventilation fees, plumbing fixture fees and other applicable items. The final fee depends on the exact work area, occupancy classification, cooking equipment, plumbing scope and current City fee schedule.

Start Your Restaurant Permit Drawings

Send us the address, proposed restaurant concept, equipment list, existing drawings and any landlord or city comments. We will review the permit path and tell you what drawings are likely needed before you build.

Who Our Clients Are:

Homeowners

Home renovations, additions, custom home builds and more. We help homeowners get their building permit fast with a complete set of drawings prepared in-house by our experts.

Commercial Property Owners

We work with restaurant owners, retail store owners, office managers and any other commercial owners to get their building permits approved fast and make their project reality.

Industrial Property Owners

We also specialize in working with all kinds of industrial properties, including distribution centres, warehouses and even grow houses that are sustainable and fully functional.

Contractors and Builders

We work with contractors and builders to ensure any project goes smoothly and the building permits get approved fast. We provide a full range of construction management services.